Thursday, 26 March 2026
Hobart.news

Latest news from Hobart

Story of the Day

Night Resurfacing on Brooker Highway and CBD Upgrades Impact Hobart Commuters

AuthorEditorial Team
Published
26 March 2026/05:44
Section
City
Night Resurfacing on Brooker Highway and CBD Upgrades Impact Hobart Commuters
Source: Wikimedia Commons / Author: Wiki ian

Hobart Traffic and Commute Update: Thursday, 26 March 2026

Commuters across Greater Hobart should prepare for a mix of daytime and evening disruptions today, Thursday, 26 March 2026. While the morning peak is expected to flow relatively well on major arteries, several infrastructure projects and resurfacing works are reaching critical stages, particularly in New Town and the CBD.

Major Artery Alerts: Brooker Highway

The Department of State Growth is continuing essential resurfacing and line marking on the Brooker Highway in New Town. Works are concentrated between Risdon Road and Park Street for traffic heading toward the city. While the heaviest activity occurs during night hours (7:30 pm to 5:30 am), commuters should look out for changed lane configurations and a reduced speed limit during the day. Motorists are advised to allow an extra 15 minutes of travel time when traversing this section, as equipment may remain near the shoulder.

CBD Intersection Upgrades

Significant roadworks are ongoing at key intersections within the Hobart CBD. Residents and evening commuters should note the following:

  • Liverpool Street and Murray Street: Night works continue between 6:00 pm and 6:00 am. Road surfaces may be uneven during the day, so caution is advised.
  • Collins Street and Murray Street: Intersection upgrades are underway nightly until Monday, 30 March. Traffic management remains in place to guide vehicles through the site.

Suburban and Local Roadworks

In the northern suburbs, New Town and Moonah see localized disruptions today:

  • Queens Walk, New Town: Daytime works between Gas Road and Selfs Point Road are scheduled from 7:00 am to 5:00 pm. This project is expected to conclude tomorrow, 27 March.
  • Springfield Avenue, Moonah: Resealing work continues between 4:00 pm and 4:00 am. Expect increased heavy vehicle movement and minor delays in the area.
  • Browns Road, Hobart: Phase 1 of the road closure remains in effect until 29 March. Local detours are in place.

Tasman Bridge and Eastern Shore

The Tasman Bridge Eastern Shore pathway connections project is nearing its scheduled completion. While most work is localized to the pathways, reduced speed limits remain in effect near the bridge approaches. Drivers should maintain awareness of traffic controllers as the project wraps up this month.

Public Transport Update

Metro Tasmania reports that most Hobart services are running to their standard Thursday schedule. However, bus routes utilizing Browns Road will continue to follow established diversions due to the Phase 1 closure. Passengers are encouraged to check the Metro Tas app for real-time updates on individual service timings impacted by the Brooker Highway resurfacing.